Pwodwi yo

T9 PTFE Wedge mekanik sele

Deskripsyon kout:

T9 PTFE Wedge Mechanical Seal ranplase AES M01, VULCAN 1609, JOHN CRANE 9, ROTEN 90, STERLING 290

 

 


  • Kategori:PTFE Wedge mekanik sele
  • Mak:XINDENG
  • Modèl: T9
  • MOQ:5 ansanm
  • Tèm Peman:T/T, L/C, WU
  • Livrezon:Eksprime, machandiz lanmè, machandiz lè
  • Anbalaj:Katon
  • Pò:Shanghai, Lachin
  • Pwodwi detay

    FAQ

    Tags pwodwi

    Deskripsyon

    Deskripsyon:
    T9 sele mekanik
    Ranplasman pou:
    John Crane T109, T9, T909 sele
    Aesseal M01 sele
    Roten 90 sele
    Sealol T sele
    Sterling 290 sele

    Kondisyon operasyonèl:
    Tanperati: -40 ℃ pou + 250 ℃
    Presyon: ≤1.2MPa
    Vitès: ≤15m/s

    Kalite chèz:
    Estanda: 16
    Altènatif: N, T21

    Materyèl:
    Bag estasyonè: Silisyòm Carbide Reyaksyon Kole, Seramik (Alumina), Silisyòm Carbide Sintered Pressureless, Ni-liyan Tengstèn
    Rotary bag: Antimwàn Impreg. Kabòn Graphite, résine enpreye Kabòn Graphite (Furan), Silisyòm Carbide Reyaksyon Kole, Silisyòm Carbide Sintered Pressureless, Ni-liyan Tungstèn Carbide
    Prentan ak pati metal: Nerjaveèi, Nerjaveèi,, Hastelloy C-4 alyaj
    Segondè sele: PTFE pi bon kalite

    Aplikasyon:
    Dlo pwòp,
    Dlo dlo egou
    Lwil oliv ak lòt likid modera korozivite

    Karakteristik

    7f1eca3d

    d(pous) d D3 D2 D1 L1 L2
    0.500 12.7 26.7 13.4 25.4 20.62 7.9
    0.625 15.8 30.66 16.6 31.75 19.05 10.3
    0.750 19 33.83 19.7 34.93 22.23 10.3
    0.875 22 JO 37 22.9 38.1 23.8 10.3
    1.000 25.4 40.1 26.1 41.28 25.4 11.1
    1.125 28.5 43.36 29.3 44.45 26.97 11.1
    1.250 31.7 48.13 32.4 47.63 26.97 11.1
    1.375 34.9 51.3 35.6 50.8 28.58 11.1
    1.500 38.1 54.48 38.8 53.98 28.58 11.1
    1.625 41.2 60.83 42.4 60.33 34.93 12.7
    1.750 44.4 64 45.5 63.5 34.93 12.7
    1.875 47.6 66.68 48.7 66.68 34.93 12.7
    2.000 50.8 70.36 51.9 69.85 34.93 12.7
    2.125 53.9 76.7 55 76.2 42.85 14.3
    2.250 57.1 79.88 58.2 79.38 42.85 14.3
    2.375 60.3 83.06 61.4 82.55 42.85 14.3
    2.500 63.5 86.23 64.6 85.73 42.85 14.3
    2.625 66.6 89.4 67.7 85.73 42.85 15.9
    2.750 69.8 92.58 70.9 88.9 42.85 15.9
    2.875 73 95.76 74.1 95.25 42.85 15.9
    3.000 76.2 97.33 77.3 98.43 42.85 15.9
    3.125 79.3 100.5 80.5 101.6 42.85 19.8
    3.250 82.5 105.28 83.6 104.78 42.85 19.8
    3.375 85.7 108.46 86.8 107.95 42.85 19.8
    3.500 88.9 111.63 90 111.13 42.85 19.8
    3.625 92 114.8 93.1 114.3 42.85 19.8
    3.750 95.2 117.98 96.3 117.48 42.85 19.8
    3.875 98.4 121.16 99.5 120.65 42.85 19.8
    4.000 101.6 124.33 102.7 123.83 42.85 19.8

     

    车间1 车间2

    车间3


  • Previous:
  • Pwochen:

  • Pwodwi ki gen rapò